The hangar is undergoing a serious upgrade so that the Onex build can proceed at its new location. I’d been using the hangar for overflow storage after moving to the airport, so lots of stuff had to be relocated or removed.
I also never fully set up the hangar as a workshop, so I have been building/installing new workbenches and cabinetry so I can have adequate space to work, and adequate storage for tools and parts. As an added bonus, all the tools, parts, etc. associated with my Searey now have new storage and workspaces also.
So far I’ve spent about 40 hours on the hangar cleanup with still much more to do, such as building platforms for my simulators. I also plan on adding a second story mezzanine to the back of the hangar (and will probably relocate the simulator there), but that will be a winter project.