Inboard paddle assembly

Work on the inboard paddle assembly tonight. Noted that the plans call for two screw sizes that don’t make sense (one so short it can’t catch the lock nut on the thread and have any showing, the other has 5 threads showing. Measures the S32 and S34 screws and noted they are actually much longer/shorter, and don’t match the labels on the bags. Disassembled and filed the opening for the paddle as it was catching a bit on the edges and we couldn’t get it to tighten down flush. Will need to order the proper screws this week and reassemble before next week’s build night.

Photos to be added